Sun 10 Jun 2007
Marco and John came back this week to survey and mark the house corners on the footings. After that, the ICF folks started laying down the blocks, starting with the more complex parts of the layout. Here’s a couple of pictures showing what this looks like:
 Rene came to visit for the weekend; we worked to take apart the formork for the footings. This was a pretty difficult job, having to pry and dig out the stakes. It took a whole day to completely dismantle the forms (this took Michel 3 weeks to build). Here’s all that’s left of the forms:
Rene and I also installed most of the drain, covered it with gravel, and started leveling the crushed stone in the basement floor.
June 11th, 2007 at 5:36 pm
I just found your site ! We shall be watching with interest. We hope problems and snags are minimal for the rest of the project. Glad we visited the site with S, J and C..we have a better idea of the scale of things.
June 13th, 2007 at 5:46 pm
I noticed your brother is not on the pictures anymore. Is he not helping you?
June 25th, 2007 at 8:10 pm
Looks amazing. You really should start tagging the blog before it gets out of control!